From 11 February 2025 until 16 February 2025
Mariners are advised that a lifting operation to remove the gangway to the MDL Events Pontoon in Brixham Harbour will take place on Wednesday 12/02/2025. This will involve both land based and floating cranes to remove the gangway, which will be placed on a barge and towed to the Middle Pier in the inner harbour, before being lifted ashore. All vessels operating in Brixham Harbour are required to give both the lifting operation and tow a wide berth, and to pass dead slow to minimise wash.
For further information on the day, contact ‘Solidarity’ on VHF Channel 14.
Captain Tim Jones.
Tor Bay Harbour Master